New System Installation
Installation of a new onboard capability, including the technical interfaces required to connect it with the vessel.
PANAMA · PANAMA CANAL · ONBOARD TECHNICAL PROJECTS
Installing, replacing or modernizing equipment on board?
TESS assesses the requirement, defines the coordinated technical scope, sources equipment where required, organizes specialist attendance and connects installation, integration, testing and documentation as one project.
ONE TECHNICAL INTEGRATOR. FROM SCOPE DEFINITION TO TESTING AND HANDOVER.
Complete documentation is not required for initial contact. Send the vessel, location, planned window, equipment requirement and whatever technical information is already available.

A marine installation project is rarely limited to placing a new unit on board. The equipment must fit the available space, connect to vessel power and controls, interface with piping or structure, remain accessible for operation and maintenance, and be tested within an agreed technical scope.
TESS begins with the requirement and the vessel context. We assess available information, identify missing technical inputs, define the project interfaces and coordinate the resources needed to move from a proposed solution to an integrated onboard system.
The result is one coordinated technical scope rather than a collection of disconnected purchases and contractor visits.
The execution model is adapted to the confirmed requirement, vessel condition and available project window.
Installation of a new onboard capability, including the technical interfaces required to connect it with the vessel.
Replacement of existing machinery or equipment where dimensions, services, controls or foundations may differ from the original unit.
Integration of new equipment or functionality into an existing vessel arrangement without treating the new system in isolation.
Planned upgrades to improve maintainability, control, monitoring or system performance within a defined technical scope.
Migration from unsupported equipment to a maintainable solution, including review of control, signal and power interfaces.
A coordinated project involving mechanical, electrical, automation, piping, structural, procurement or specialist workstreams.
The physical installation is only one part of the job. A technically complete scope must identify every interface that can affect fit, operation, testing and handover.
Those interfaces are reviewed against the actual vessel arrangement and the selected equipment. Where information is incomplete, TESS helps define the surveys, measurements, drawings or specialist inputs needed before execution.
TESS acts as the technical integrator and coordination point for the confirmed project scope.
The same integration method can be applied across a range of marine equipment and vessel systems.
Switchboards, distribution, motors, generators, converters and related protection or control interfaces.
Control cabinets, alarms, sensors, PLC/HMI functions and interfaces between shipboard systems.
Bridge equipment and supporting electrical, data, structural and commissioning requirements.
Pumps, filtration, treatment equipment, heat exchangers and associated piping or control changes.
Equipment changes requiring coordinated mechanical, hydraulic, electrical and control work.
Winches, cranes, hydraulic power units and equipment with structural, piping and control interfaces.
Equipment installation or replacement with defined testing, documentation and specialist coordination.
Planned retrofit or replacement projects subject to the vessel, equipment and applicable technical requirements.
A project can fail at the boundary between otherwise competent suppliers. The equipment vendor may not own the piping change. The electrician may not own the automation logic. The fabricator may not have the final equipment dimensions. The commissioning specialist may arrive before the installation is ready.
TESS coordinates those boundaries through one technical project structure: confirmed responsibilities, shared inputs, interface checks, execution sequencing and a defined route to testing and handover.
The shipowner or manager retains visibility of the whole scope without having to reconstruct the technical plan from separate contractor updates.
ONE INTEGRATOR. THE WHOLE TECHNICAL SCOPE.
Equipment sourcing and onboard installation should not be treated as unrelated transactions. A commercially available unit is not automatically a technically compatible replacement.
TESS connects specification verification, sourcing and installation planning so the procurement decision reflects the vessel interfaces that will determine whether the equipment can actually be integrated.
Each stage creates the technical basis for the next, while the depth of engineering and documentation is matched to the actual project.
Review the vessel, requirement, existing system, available information and operating constraints.
Establish the technical scope, responsibilities, interfaces, exclusions and required outcomes.
Organize measurements, drawings, calculations, specialist inputs and execution sequencing.
Verify and source equipment, materials and technical services included in the confirmed scope.
Coordinate logistics, access, personnel, tools, materials and the vessel's available project window.
Execute or coordinate onboard work while managing multidisciplinary technical interfaces.
Coordinate inspections and functional checks against the agreed scope and available test conditions.
Compile the agreed technical records, outstanding items and handover information for the project.
Panama can provide a practical project location for vessels trading through the Canal or planning technical attendance between voyages. Execution still depends on scope, vessel access, equipment availability, specialist requirements and the time realistically available.
TESS plans around the vessel's confirmed availability where feasible. We do not assume that every installation can be completed during one port call or Canal transit window.
Technical preparation, logistics and onboard attendance can be coordinated for an appropriate Pacific-side vessel call, berth or anchorage arrangement.
Project support can also be coordinated around Atlantic-side access, vessel availability and the confirmed installation requirements.
Some projects require input, review or attendance from classification societies, flag representatives, equipment manufacturers or other technical authorities. The applicable route depends on the vessel, equipment, modification and confirmed scope.
TESS can coordinate the technical interfaces and documentation flow where those parties are applicable, without presenting coordination as automatic approval or sign-off.
Support for required submissions, surveys or technical communication where applicable to the project.
Manufacturer or specialist involvement arranged where required for equipment-specific work, programming or commissioning.
Coordination of agreed drawings, equipment data, test records, punch items and handover documentation according to scope.
These projects demonstrate technical assessment, multidisciplinary coordination, procurement discipline and integrated-system experience relevant to 07.2.

TESS carried out comprehensive inspection and condition assessment, coordinated multiple companies and specialists, supported stabilization and recovery of essential systems within the confirmed scope, and prepared a detailed long-term recovery roadmap.
TESS supports specification-based procurement, technical verification, international sourcing and logistics coordination for awarded supply work serving Panama Canal Authority maintenance and operational requirements.

Project history delivered under the leadership of the TESS team's lead engineer includes control cabinets, bridge consoles, field installation, integration and functional testing across connected vessel systems.
You do not need a complete technical specification before contacting TESS. Start with the requirement and the information currently available.
Tell us what must be installed, replaced or modernized, where the vessel will be and when the project is being considered.
Attach photos, drawings, manuals, technical specifications, datasheets or relevant correspondence when available. Complete documentation is not required for an initial assessment.
Prefer to discuss the scope directly? Call +507 6988-8852 or email info@tessmarine.com.
The scope is defined for the specific vessel and project. It may include assessment, scope definition, engineering coordination, equipment sourcing, logistics, onboard installation, multidisciplinary integration, testing and technical handover.
Yes. Obsolescence replacement can be assessed as an integration project, including the physical arrangement, electrical supply, controls, signals, piping and documentation affected by migration to a new unit.
Yes, where procurement is included in the confirmed scope. TESS connects specification verification and sourcing with the onboard interfaces that must be addressed during installation.
No. Requirements depend on the vessel, equipment, modification and applicable rules. TESS can coordinate class, flag, OEM or specialist involvement where the confirmed project requires it.
Some projects can be planned around a vessel's Panama availability, but completion during one call is not assumed. Feasibility depends on engineering readiness, equipment, logistics, access, specialist requirements, testing and the time actually available.
No. Send the information currently available, such as photos, nameplates, manuals, drawings or datasheets. TESS can identify which additional surveys or technical inputs are needed to define the next step.
Yes. Multidisciplinary coordination is central to the TESS integration model. Specialist and subcontractor scopes can be organized through one technical coordination point while responsibilities remain clearly defined.
Testing, verification and handover are coordinated according to the agreed scope and available test conditions. The handover package can include agreed equipment data, drawings, test records and outstanding items.
This page covers planned installation, equipment replacement and retrofit. For an existing fault, urgent attendance or afloat repair requirement in Panama, use the dedicated repair service.
Explore Afloat Ship Repair PanamaIf the vessel needs a broader condition-led programme across several systems, priorities, disciplines or execution phases, use the dedicated refit and modernization service.
Explore Ship Refit & ModernizationIf the defined system installation is scheduled inside a yard period, connect its integration scope to the wider work list, procurement readiness and docking execution programme.
Dry-Dock Planning & CoordinationFor an obsolete, other-brand or existing FARAD heat exchanger requiring new equipment and onboard integration, use the specialist equipment and engineered-replacement pathway.
FARAD Equipment & Engineered ReplacementONE INTEGRATOR · THE WHOLE TECHNICAL SCOPE
TESS will review the available information, identify the main technical interfaces and define what is needed to move the installation, replacement or retrofit project forward.
ASSESS. DEFINE. COORDINATE. INTEGRATE. TEST. HAND OVER.