HI-FOG fire protection on an Oasis-class cruise ship

Installation and commissioning of Marioff HI-FOG water-mist fire protection during construction of one of the world's largest cruise vessels — coordination of manpower, materials and progress inside a yard running thousands of workers.

Client: Marioff / LTH-Baas

Scope & results

  • Installation planning synchronized with the overall shipbuilding schedule
  • Testing, commissioning and final acceptance completed before vessel delivery
  • Experience repeated on a second Oasis-class program (engineering coordination)
Fire protectionCruise newbuildingInstallation supervision

Delivered under the leadership of our lead engineer

Project photos

Oasis-class cruise ship under construction in the shipyard building dockHead-on view of the cruise ship bow inside the building dockHI-FOG valve and manifold assembly installed alongside cable trays on board

Vessel in the canal zone?

Tell us the vessel and the problem. We respond 24/7.

Direct line+507 6988-8852info@tessmarine.com
PacificBalboa · PanamáPacific terminal
AtlanticCristóbal · ColónAtlantic terminal
Request a Service